Hello,
i have open a ticket in the mantis tracker system for a long time.
the number is 0003758 and i wait for an answer.
Is there a problem in testlink 1.9 rc1 or is there a problem in my question ?
I need the function with differend plattfoms in the testplan.
Who can help me ?
Thanks
Sven
Test Plan Report mixed Test cases
Moderators: Amaradana, TurboPT, TL Developers
Re: Test Plan Report mixed Test cases
you have to upgrade to stable release.
Re: Test Plan Report mixed Test cases
Hello,
yes.
At the moment i have again download the newest version of testlink.
But it is the same problem.
I have 2 plattforms(desktop, laptop) and 4 different test cases(a,b, x, y).
Then i create a new testplan and a build with the 2 plattforms.
Then allocate the cases a and b to the desktop plattform and the x and y case to the laptop plattform.
Then run the test with the result OK and have a look to the report.
In the report i see on the desktop, 2 case OK (a,b) and 2 case(x, y) not run
On the laptop plattform a and b not run but x and y are OK
Can you follow me and simulate the problem ?
best regard
Sven
yes.
At the moment i have again download the newest version of testlink.
But it is the same problem.
I have 2 plattforms(desktop, laptop) and 4 different test cases(a,b, x, y).
Then i create a new testplan and a build with the 2 plattforms.
Then allocate the cases a and b to the desktop plattform and the x and y case to the laptop plattform.
Then run the test with the result OK and have a look to the report.
In the report i see on the desktop, 2 case OK (a,b) and 2 case(x, y) not run
On the laptop plattform a and b not run but x and y are OK
Can you follow me and simulate the problem ?
best regard
Sven
Re: Test Plan Report mixed Test cases
think this issue will be part of 1.9.1 release. Please do some search on mantis for issues similar to 3758