Hi.
I am trying to build the following:
build a testplan and assign it to tester
build a new testplan and assign to a different tester
What I'd like to do is have some kind of rule that triggers the second testplan first if conditions set in testplan 1 is met.
Hope someone can tell me if this is possible in any way.
To sum it up. tester 2 shouldnt see or be able to do his tests before tester 1 has done his tests.
building test requirenments
Moderators: Amaradana, TurboPT, TL Developers
Re: building test requirenments
No way as in....?
Thats not possible?
Why would anyone want to do that?
Or what....?
Thats not possible?
Why would anyone want to do that?
Or what....?
Re: building test requirenments
with current test link implementation (1.9 BETA 6) there is no way to do what you have requested