building test requirenments
Posted: Fri Sep 03, 2010 9:53 am
Hi.
I am trying to build the following:
build a testplan and assign it to tester
build a new testplan and assign to a different tester
What I'd like to do is have some kind of rule that triggers the second testplan first if conditions set in testplan 1 is met.
Hope someone can tell me if this is possible in any way.
To sum it up. tester 2 shouldnt see or be able to do his tests before tester 1 has done his tests.
I am trying to build the following:
build a testplan and assign it to tester
build a new testplan and assign to a different tester
What I'd like to do is have some kind of rule that triggers the second testplan first if conditions set in testplan 1 is met.
Hope someone can tell me if this is possible in any way.
To sum it up. tester 2 shouldnt see or be able to do his tests before tester 1 has done his tests.