Assigning bulk test cases/test suite to test plan
Moderators: Amaradana, TurboPT, TL Developers
Assigning bulk test cases/test suite to test plan
Hi I have a regression test suite which comprises of 200 test cases. This particular suite needs to be executed once in two weeks sprint cycle. I am feeling really difficult to add these cases one by one into my test plans. Is there a way i can do bulk test case assignments with my test plan?
Re: Assigning bulk test cases/test suite to test plan
since a long time add test cases to test plan can be done in massive mode.
have you tried?
what problem has you faced?
have you tried?
what problem has you faced?
Re: Assigning bulk test cases/test suite to test plan
If you have the proper permissions, there should be an "Add / Remove Test Cases" link under "Test Plan contents". Click it and then you can navigate the tree on the left side. Click on the folder you want and on the right side all the test cases in that folder should appear. Use the buttons at the top of the right side to do what you want. It can be a little confusing at first, but it gets easier with practice. I suggest setting up a test project/test plan/Build/Test Cases and playing with the different options before doing it in your main TestPlan. 