Concerning the Requirements: Due to we have a big project with al lot of requirements which are splitted into sub-requiremets, is there a way to widen the hirarchy of the requirement structure?
Like:
New Specification->Sub-Specification1->Sub-Specification2
Because the tree structure is too flat to display all requirements for our project.
Thx in advance for the answer...
Basti
Requirements Specification
Moderators: Amaradana, TurboPT, TL Developers
How much work do you think it would take to get the requirements tree in TestLink? Do you have any specifications/functional requirements drawn up?havlatm wrote:It could be 1.9 version, but there is no assigned developer yet. You can speed-up/assure it if you assign own man to take it (with our help of course).
MArk B.
I got TestLink working last night and made the config change you indicated. The tree works as you said. Really glad to have it. Thanks.
One thing that's going to need changed is the Icon for the child spec files.
I also noticed some error messages in the log file. I'll log this in the bug tracker when I get them tracked down.
MArk B.
One thing that's going to need changed is the Icon for the child spec files.
I also noticed some error messages in the log file. I'll log this in the bug tracker when I get them tracked down.
MArk B.